5000 Plus High Early Strength Concrete Mix
Data SheetProject Level: easy
Project Length: 5 Minutes
Project Guide – Mixing Concrete Using a Mixer
Project Guide – Setting Posts and Poles
Being confident in your project timing is the most important first step. Once you start mixing, you have approximately one hour to mix and place all of your materials to avoid cold joints.
With each round of mixing taking approximately 5 minutes, you can complete a maximum of 12 rounds of mixing in that timeframe.
Most standard mixers allow for a maximum of two 80# bags of concrete per batch for a total of 24 bags in an hour. Mixing flat-out, the output of this mixing method is capped at about 14 sq.ft. of material. If you’re planning a larger pour, consider a second mixing station or dividing the project into smaller sections.
Project Tip: Use the Sakrete App to measure, estimate and purchase materials for the job straight from your phone.
Get ready to do some work!
Project Tip: Bagged mixes are designed to be much “dryer” than concrete out of a ready mix truck. Trust the water ratios on the bag – they will yield a rich, workable mix once placed and consolidated!
Enter An Email To Send These Results.